Desynced Feedback

Search
IDRatingCategoryDescriptionScreenshotDate
4209🙂SuggestionThe behavior option to Place Construction should return a reference to that building. Likewise, there should be a WaitForConstruction option that takes said parameter as an input, and replaces it with a reference to the constructed building's reference when done. 2024-04-06 16:28:41

IDReplyAuthorDate

EULA    |    Privacy Policy    |    Presskit


© 2025 Stage Games • All rights reserved