Desynced Feedback

Search
IDRatingCategoryDescriptionScreenshotDate
4663🙂GeneralI think the "Switch" behavior should accept more values. If I want to use it to branch paths depending on numbers or specific entities, I have to first use a parameter or do something to add what I want as a criteria to a variable, for example using "Copy". I think this should not be the case, and that switch should work with everything. It is a shame that there are so few options to create more than 1 branching path in one instruction. 2024-09-03 15:32:03

IDReplyAuthorDate

EULA    |    Privacy Policy    |    Presskit


© 2025 Stage Games • All rights reserved