| 5791 | 🙂 | General | Upgrading a unit (building) with an integrated behavior into another unit (building) while keeping that behavior, leads to the rebuilding being stuck waiting on an integrated behavior controller.
Example: I had a 1x1(1S) with a fabricator and an integrated behavior. Editing this to change the platform to a 1x1(2S) and adding a second fabricator caused the building to go into construction again. Completing the upgraded building required removing the behavior.
I'd expect the integrated behaviour controller to 'stay' in the upgraded building. | | 2025-11-12 20:05:22 |