Desynced Feedback

Search
IDRatingCategoryDescriptionScreenshotDate
813😟BugIm not sure if this is a bug or not but i have a building with two robotic assemblers. they wont stop requesting materials for a job they cant finish and which has been cancelled. there is no way to complete either job or change the contents of the building.(cant change inv cause of the constant requests) 2023-08-20 08:23:02

IDReplyAuthorDate

EULA    |    Privacy Policy    |    Presskit


© 2025 Stage Games • All rights reserved